Name of Project : | Abu Dhabi Dubai road |
Location : | Seih Seidera- Abu Dhabi- UAE |
Client : | Musanada |
Consultant : | AECOM |
The Department of Transport through this project aims to alleviate traffic congestion on the current main road connecting Abu Dhabi to Dubai (E11), and provide a new strategic link between the two most populated emirates in the country, as well as create new entrances to the city of Abu Dhabi, Abu Dhabi International Airport, and Yas and Saadiyat Islands.
The new Abu Dhabi – Dubai main road (E311) is one of the biggest infrastructure projects that the Department of Transport is working on as part of its Surface Transport Master Plan (STMP).
Musanada has signed a contract to implement the new project, in its first and second phases, with each of Ghantoot Transport and General Contracting Establishment, Tristar Engineering and Constructions, and Abu Dhabi Salini Costruttori.
The Scope of our work included the entire Electrical System is Supply, Installation, Testing and commissioning of 33KV Dead End tower
Name of Project : | Tilal Liwa Street Light Work |
Location : | Madinat Zayed- Abu Dhabi, U.A.E. |
Client : | Western Region Municipality |
Located in Liwa, Abu Dhabi’s Western Region, the 111 room Tilal Liwa Hotel overlooks the scenic Liwa Oasis on one side and the legendary Rub Al Khali (Empty Quarter) Desert on the other. Located in the heart of the rolling dunes of the UAE. Perched at the edge of the Rub Al Khali desert in the United Arab Emirates, conveniently located along the modern Sila highway, near Mezzaira village, 175-kilometre leisurely drive from Abu Dhabi city and Abu Dhabi International Airport.
The Scope of our works included are Supply, Install, Testing & Commissioning of Street Light, Over Head Line and Supply, Install, Testing & Commissioning of shifting of 11KV Cable.
Name of Project : | District coolant plant |
Location : | Abu Dhabi new Airport - UAE |
Client : | ADAC |
Consultant : | ACE International Consultant |
The construction contract for the USD 75 million District Cooling Plant at the Midfield Terminal Complex (MTC) in Abu Dhabi. The district cooling plant will have a capacity of 60,000TR to service the midfield airport terminal where the UAE's national airline's operations (Etihad) will be based. The terminal is expected to accommodate 20-40 million passengers annually. The project will include 160 check-in desks. The project will also include a 3-star transit hotel which will offer 163 rooms and a metro link to the airport.
The Scope of our work included the entire Electrical System is Supply, Installation, Testing and commissioning of 22KV Electrical Works for main feeder connection between the DCP to Primary PSS1(ARPPRY5).
Name of Project : | Petrol Pump |
Location : | Camel Race - Abu Dhabi - UAE |
Client : | Abu Dhabi Club |
Al Wathba service station has been refurbished as part of ADNOC Distribution’s ongoing efforts to modernise its network and upgrade equipment and machinery to cope with growing customer demand for the company’s best-in-class products and services
The Scope of our work included supply, install, testing & commissioning of LV Electrical works (LV Panels, cable wire, capacitor bank, circuit breakers and switch gear panels).
Name of Project : | Amity International School |
Location : | Al Bahia New - Abu Dhabi - UAE |
Client : | Amity International school |
Consultant : | Dewan |
The mission of Amity International School is to provide a platform for ideal integration of intellect, values and talents through education and develop each child to his optimum potential to enable him to make path breaking changes in the social fabric of the world.
The Scope of our work included the entire Electrical System is Installation, Testing and commissioning of (11KV works) transformers, QRM, TRM, HV Joints, termination and cables connection
Name of Project : | Adnoc Petrol Station |
Location : | Gayathy – Western Region |
Client : | ADNOC |
Consultant : | Dorsche Gruppe |
The company was established in 1973 as the first UAE government-owned company specialized in the marketing and distribution of petroleum products within the United Arab Emirates and internationally. As one of the region’s largest and most innovative petroleum companies, ADNOC Distribution is renowned and respected for the exceptional quality and reliability of its products and services.
The Scope of our work included supply, install, testing & commissioning of LV Electrical works (LV Panels, cable wire, capacitor bank, circuit breakers and switch gear panels).
Name of Project : | Street Light Works |
Location : | P1- W58, Abu Dhabi, U.A.E.n |
Client : | Judicial department |
The Abu Dhabi Judicial Department is embarking on an era of modernization, inspired and guided by the wise vision of HH Sheikh Khalifa bin Zayed Al Nahyan, President of the UAE and Ruler of Abu Dhabi. His vision is to ensure justice that fosters citizens' and residents' rights, promotes equality and ensures security as well as socio-economic development.
The Scope of our works included the Removal & Cancellation of street light as ADDC. All pole lights will be restored to ADDC store.
Name of Project : | Railway/ Over Head Line |
Location : | Camel Race, Abu Dhabi, U.A.E. |
Client : | Etihad Railway, Abu Dhabi, U.A.E. |
Etihad Rail was established in June 2009 under Federal Law no. 2, with a mandate to manage the development, construction and operation of the UAE’s national freight and passenger railway network.
The Scope of our works included the Supply, Installation, testing and commissioning of diverting 11KV Overhead transmission line route
Name of Project : | Commercial Building |
Location : | Musafah - ME9 C20- Abu Dhabi - UAE |
Client : | Ali Al Shamsi |
Consultant : | Firas |
The Scope of our works included the Supply, Installation, testing and commissioning of LV Electrical works, Fire Alarm System, Telephone and T.V. System.
Name of Project : | Commercial Building |
Location : | Musafah - ME9 C20- Abu Dhabi - UAE |
Client : | Ali Al Shamsi |
Consultant : | Firas |
The Scope of our works included the Supply, Installation, testing and commissioning of LV Electrical works, Fire Alarm System, Telephone and T.V. System.
Name of Project : | Street Light Work |
Location : | Sector SH34, Plot P8, Abu Dhabi, U.A.E. |
Client : | Western Region Municipality |
The Western Region Municipality (WRM) is a government entity that operates independently with full legal capacity, under the umbrella of the Department of Municipal Affairs. It offers its services in Abu Dhabi’s Western Region, in each of Sheikh Zayed city, AL Mirfa, Liwa, Al Sila, Ghayathi and Delma.
The Scope of our works included the street light works and replacement of Metal Halide Light to LED.
Name of Project : | Complex Villa |
Location : | Al Ain – Al Markhamia |
Client : | Mr. Mohamed Al Mansoori |
Consultant : | Granada Arc. & Consulting Engineers |
The Scope of our works included the Supply, Installation, and Testing & Commissioning of LV Electrical works (LV Panels, cable wire, capacitor bank, circuit breakers, and switchgear panels).
Name of Project : | Commercial Building |
Location : | Abu Dhabi – E10 C13- Abu Dhabi - UAE |
Client : | Ahmed Al Mouhairbi |
Consultant : | Biruit Engineering |
The Scope of works include are Supply, Install, Testing & Commissioning of LV Panel 1600kA ACB, Capacitor Bank 100KVAR, cable wirings, Earthing system, Light and Power System.
Name of Project : | Ghantoot Labor Camp Ruwais |
Location : | Ruwais, Abu Dhabi, U.A.E. |
Client : | Ghantoot Contracting Co |
Consultant : | Dar al- handasah shair and partners |
The new labor camp for Ghantoot Co. in Ruwais (the new Infrastructure Project). Camp consists of 14 residential zones, offices, workshop & batching plant with total power of 5.1MW. Power distributed through four substations of 1500KVA
Name of Project : | GCCIA Interconnection of Substations (Physical Security System) |
Location : | UAE-KSA Borders, Silaa |
Client : | GCCIA |
Consultant : | Cegelec |
Recognizing the benefits of interconnection of their Power grids, the six Arab states of Kuwait, Saudi Arabia, Bahrain, Qatar, United Arab Emirates (UAE) and Oman decided to build an AC interconnection of the 50 Hz systems of Kuwait, Bahrain, Qatar, UAE and Oman with a back-to-back HVDC interconnection to the 60 Hz Saudi Arabian system.
The Scope of our work included the entire Electrical System is Supply, Installation, Testing and commissioning of Electrical Works for Physical Security System (CCTV Cameras, Access System for Doors, Card Readers, OEBs & IEBs)
Name of Project : | Al Reef-2 Villas |
Location : | Al Samha, East Old, Abu Dhabi, U.A.E. |
Client : | Manazel |
Consultant : | Dorsche Gruppe DC Abu Dhabi |
Al Reef 2 is a mixed-use development spanning 465,000 sq. m. and comprising 860 duplex villas as well as leisure and retail offerings. The project is located in Al Samha, off the highway between Abu Dhabi and Dubai, near Kizad and Khalifa Port. The Al Reef 2 community includes a school and kindergarten with an international standard football pitch. The Retail center at the heart of the development provides a wide choice of restaurants, cafes, shops and services. Al Reef 2 comprises two types of duplex villas, one of three bedrooms and the other of two bedrooms and a family room, with a total built up area of 2,330 sq. ft., and two parking spaces for each type.
The Scope of our works in this project are Supply, Installation, and Testing & Commissioning of Internal and External Electrical works such as:
Name of Project : | Construction of Substation for Fujairah Police GHQ |
Location : | Fujairah, U.A.E. |
Client : | Fujairah Police |
Consultant : | Express Facility Management |
The Scope of our works in this project are Supply, Installation, and Testing & Commissioning of MDB, SMDB, DBs, Capacitor Bank and LV cables.
Name of Project : | Construction of Workshop |
Location : | Sector No. M11, Plot 35, Mussafah, Abu Dhabi |
Client : | Mr. Ahmed Abdulla Zahran Alnabhani |
Consultant : | City Image Engineering Consultancy |
The Scope of our works in this project are Supply, Installation, and Testing & Commissioning of Electrical and Telephone works such as MDB, SMDB, FDB, Capacitor Bank, Consumer Unit, LV cables, Isolators, Switches and Sockets.
Name of Project : | Abu Dhabi International Airport, Midfield Terminal Building |
Location : | Abu Dhabi Airport, Abu Dhabi, U.A.E. |
Client : | Abu Dhabi Airports Company (ADAC) |
Consultant : | KPF Consulting |
The Scope of our works in this project are Supply, Installation, and Testing & Commissioning of Electrical and Telephone works such as MDB, SMDB, FDB, Capacitor Bank, Consumer Unit, LV cables, Isolators, Switches and Sockets.Conceived as a gateway to Abu Dhabi, the Terminal Building is raised up from the road level giving the appearance of sitting on its own plateau. In this context the building is the dominant and most impressive structure on the horizon with its dynamic profile silhouetted against the sky. At night the building’s illuminated interior will be visible from the highway over 1,500 meters away.
On approaching the Terminal Building the roadway system and landscaping work together to create a sequence of events culminating in a monumental civic space inside the terminal. Internally the scale of the Departure Hall, a 50-meter-high space rendered largely column-free through the use of long span leaning arches, endows the building with an open, outdoor quality, with the supporting arches visually separated from the roof to enhance the lightweight feel. On plan, the X-shape provides the greatest programmatic efficiencies enabling the terminal to extend to 49 gatehouses, accommodating 59 aircrafts at any one time.
Name of Project : | Construction of Buildings in Camp 141276 |
Location : | Zayed Military City, Abu Dhabi, U.A.E. |
Client : | General Head Quarters U. A. E. Armed Forces or the Command of Military work (C.M.W.) |
The project calls for the construction of a military buildings and military camps located in the Al Shahama area as part of the Zayed Military City, northeast of Abu Dhabi.
The Scope of our works in this project are Supply, Install, Testing and Commissioning of 11KV cables between 11KV package units to Existing 11KV cable (Pick point).
Name of Project : | Neighborhood One Residences |
Location : | Masdar City, Plot C52, Sector SE45, Abu Dhabi, U.A.E. |
Client : | Masdar – A Mubadala Company |
Consultant : | Environmental Design System |
The Neighborhood One Residences (N1R) Project consists of 500 residential units comprising 75 one and 425 two bedrooms apartments, located on existing three-level parking podium, plot B03 at Masdar City, Abu Dhabi. The GFA is approximately 59,000 square meters.
The Scope of our works in this project are Install, Testing & commissioning of Dry type transformers each 1000KVA 22/0.4KV and 22KV panel, 22 KV Cables and LV cable termination.
Name of Project : | Repton Abu Dhabi Senior School-2 |
Location : | Al Reem Island Sector RS6, Plot P1 |
Client : | Repton Abu Dhabi Senior School-2 |
Consultant : | Aecom Middle East Limited |
Welcoming families from all nationalities, Repton School Abu Dhabi offers the very best in British education, within the context of an international community, epitomized by the school’s philosophy of ‘the best for every child’. Repton, an Apple Distinguished School, has excellent facilities and amenities, split across two sites on Reem Island, close to the heart of the city.
The Scope of our works in this project are Supply, Install, Testing & commissioning of disruption network (MDBs. SMDBs, METER BOX, and CAPACITOR. BANK, LV CABLES), Temporary power supply for office.
Name of Project : | Reem Island Development Project |
Location : | Shams Al Reem Island Plot S5-C52/C53 |
Client : | Park View Real Estate Co. LLC. |
Consultant : | Architectural Consulting Group |
The Shams Abu Dhabi project will be developed on Reem Island in Abu Dhabi and occupy approximately 25% of the island. It will occupy 1.32 million square meters of which, 90% will be dedicated to residential buildings and has a potential of developing 22,000 residential units which will house around 100,000 people whereas the rest will be available for commercial use and recreational facilities.
The Scope of our works in this project are Supply, Install, Testing & commissioning of Electrical works (MDBs. SMDBs, METER BOX, and CAPACITOR. BANK, LV CABLES) and ADDC Temporary power supply works.
Name of Project : | Construction, completion and Maintenance of Staff Accommodation for Sea Palace |
Location : | Sector W27/1, Plot 2 & 3, Abu Dhabi, U.A.E. |
Client : | Sheikh Mohammad Bin Khaled, Al Nahyan |
Consultant : | Golden Planners Consultant |
The Scope of our works in this project are Install, Testing & commissioning of two transformers each 1000KVA 11/0.4KV and QRM, RTU, DMS Integration, 11 KV Cables 3c-300/120mm2, Supply and Installation of 11KV MV Cable termination kit to complete the termination
Name of Project : | Maintenance of Street Light Pole in Western Region |
Location : | Liwa, Western Region, Abu Dhabi |
Client : | ADDC |
Abu Dhabi Distribution Company needs to maintain the Street light works in all the emirates of Abu Dhabi in order to sustain the relevant standards and maintenance of Street Light most specially, in Liwa road, Western Region Area. The Scope of our works in this project are Excavation, laying and backfilling of LV Cables, Protection Tiles and Warning tape.
Name of Project : | Construction of TRM Room |
Location : | Al Ruwais, Plot P83 |
Client : | Borouge |
Consultant : | Engineering Consultant Group |
Borouge is a leading provider of innovative, value creating plastics solutions. A joint venture between the Abu Dhabi National Oil Company (ADNOC), one of the world’s major oil and gas companies, and Austria based Borealis, a leading provider of chemical and innovative plastics solutions, Borouge is a groundbreaking at the forefront of the next generation of plastics innovation.
The Scope of works are Consultant for LV works, Supervise the LV works of the project, coordination with ADDC for inspection, installation of all electrical works and high voltage works.
Name of Project : | Yas-Mina Zayed Gas Pipeline |
Location : | SectorYS3_01 Plot SVS1 and Sector SDN6 Plot CRS1 |
Client : | Abu Dhabi Gas Industries LTD GASCO |
Consultant : | Penspen International LTD |
The Project of GASCO involves laying natural gas pipeline from Yas Island to Mina Zayed port, with 24-inch, 45-kilometre gas pipeline to supply gas to the existing natural gas vehicle filling station.
The Scope of works are Excavation, laying, Testing & Commissioning, Back filling, Termination of LV Cable between ADDC feeder pillar to Yas mina Zayed Gas pipe line and another work same in al saadiyat island for laying, excavation, testing and commission
Name of Project : | ADNOC Al Marfa Marine Substation |
Location : | Sector Al Marfa, Plot EPD15031 |
Client : | Abu Dhabi National Oil Company |
Consultant : | Al Torath International Consulting Engineers |
ADNOC Distribution announced the opening of Al Marfa City service station in the Western Region of Abu Dhabi as part of the company’s strategic expansion plan to meet the growing demand for its high-quality products and services.
Located on the Hospital Street and next to the Integrated Government Services Centers “Tamm”, the latest addition to ADNOC Distribution’s network takes the total number of service stations in the Western Region to 36.
The Scope of works are Supply, Installation, Excavation and laying, testing and commissioning of LV Main cables.